ESTABLISHMENT OF 110 KILOMETRES LONG, 4-LANES DUAL CARRIAGE WAY INCLUDING:
• REMOVING THE EXISTING DAMAGED ASPHALT .
• PLACING NEW BASE COURSE LAYER BY FINISHER .
• PLACING BINDER ASPHALT LAYER AND WEARING ASPHALT LAYER .
• PLACING A THIRD LAYER OF ASPHALT AS PROTECTION BY USING (SBS) POLYMER MODIFIED BITUMEN MIXES.
• SAFETY ELEMENTS ON THE ROAD.
Contract Price : (17521126) USD
Years: FROM 15/3/2006 TO 31/10/2009
Delays: NONE
Years
From 15.Mar.2006 - till 31.0ct.2009