SOLAR POND SPOA-CONSTRUCTION OF SEPARATION DIKE PO-201403922 IFB NO.201403661
Description
CONSTRUCT A SEPARATION DIKE IN THE SOUTHERN PART OF SP0A WITH LENGTH OF 1500M, WIDTH 24M,WITH A VARIABLE HEIGHT(3-5) M. THE SEPARATION DIKE WILL BE CONSTRUCTED IN SPOA ON THE 2-3 M THICK PRECIPITATED SALT LAYER. THE NEW WEIR PLACED AT THE CURRENT BRINE DIKE LOCATION ON NATURAL SOIL . Contract Price : (1 400 000 ) USD Years : From 30/11/2014 - 9/3/2015 Delays : NONE